40’ Wide Gabled End System
Quality, Craftsmanship and Service since 1892
NAV40Gbl-1104
Copyright © Anchor Industries 2004
Please read all assembly / installation instructions before the installation or removal of this product.
1100 Burch Dr., Evansville, IN 47725
Ph. 812-867-2421 • Fx. 812-867-0547
E-mail: [email protected] • www.anchorinc.com
Navi-Trac
ANCHOR
FRAME TENT SYSTEM
5.0”
2.3”
Vue de la page 0
1 2 3 4 5 6 ... 15 16

Résumé du contenu

Page 1 - Navi-Trac

40’ Wide Gabled End SystemQuality, Craftsmanship and Service since 1892NAV40Gbl-1104Copyright © Anchor Industries 2004Please read all assembly / insta

Page 2 - TABLE OF CONTENTS

10ERECTING 2nd BEAM 1stSECURING THE 1st BEAM SAFELYERECTING THE 2nd BEAMWORKERS LIFT FIRST AT THEPEAK, THEN SHUFFLE SIDEWAYSTOWARD THE UPRIGHTS. AS

Page 3

11SECURING THE 2nd BEAM WITHDROP-IN RIDGE/EAVE BARSINSTALLING PURLINS AND RIDGE BARSCOMPLETING THE 1ST BAYIN 20’ MID BAYS ONLY, INSTALL A SUPPORT PURL

Page 4

12COMPLETING THE TOP FRAMEINSTALLING GABLED END FRAMEINSTALLING GUY WEBS BEFORE INSTALLING FABRICSTAKING DISCLAIMER: DUE TO VARYING SOIL CONDITIONS A

Page 5 - 40’ NAVI-TRAC COMPONENT LIST

13INSTALLING MID PANELPULL MID PANEL UP AND OVER THROUGH CHANNELS IN RAFTER EXTRUSIONS.WHEELED PANELGUIDERAFTERINSERT FINGERS OF WHEELED PANEL GUIDE I

Page 6

14COMPLETED 40’ GABLED END NAVI-TRAC WITHFABRIC INSTALLED AND TENSIONED, GUYWEBS STAKED AND RATCHETED TIGHT. TOMEET ENGINEERING REQUIREMENTS WALLSSH

Page 7

15HIP/GABLED END COMBINATION UNITSEE THE STANDARD NAVI-TRACINSTALLATION INSTRUCTIONS FORASSEMBLY OF THE HIP END UNIT.EXTENSION BEAMS ARE PIVOTEDIN THE

Page 8 - CENTER OF STAKE HOLE

EVANSVILLE, INDIANA28.3 11-01-02Thank you for purchasing an Anchor product. In return, we pledge Quality, Service andCraftsmanship and are available

Page 9 - FRAME DAMAGE!!

TABLE OF CONTENTSPage No. Assembly Step3 Introduction with Frame Terminology Illustration4 Component Illustrations5 40’ Navi-Trac Component List Table

Page 10 - ERECTING THE 2nd BEAM

340’ Gabled Navi-Trac Frame TerminologyINTRODUCTION:Like the hip-end version, the gabled end NAVI-TRAC frame is made up of extruded aluminum members j

Page 11 - COMPLETING THE 1ST BAY

40’ NAVI-TRAC COMPONENT ILLUSTRATIONS4

Page 12 - X-CABLED BAYS

40’ NAVI-TRAC COMPONENT LISTA MINIMUM GABLED UNIT CONSISTS OF (1) KIT #1, (1) KIT #2 AND (2) EXTENSION MIDS.TO EXTEND THE LENGTH FURTHER, SIMPLY ADD A

Page 13 - ALLING MID PANEL

6I.D. 40’ GABLED END NAVI-TRACLABEL(LETTER ONDRAWING)COMPONENT DESCRIPTIONCODES(STAMPED ORTAPED)GBLKIT1GBLKIT2HIPKIT320’MIDSTR20’MIDEXT15’MIDSTR15’MID

Page 14

7NAVI-TRAC INSTALLATION SAFETY GUIDELINESYour installation techniques will evolve to fit the needs of your clients, the experience level of your crews

Page 15

DIRECTIONS FOR SQUARING THE TENT1. USE A TAPE MEASURE TO MARK THE ENDS OF A LINE FOR ONE END (A TO B ABOVE) EQUAL TO THE EXACT WIDTH OF THE UNIT.2.

Page 16 - FAX NUMBER

9134265CONSTRUCT FIRST BEAMLAYOUT OF ALL BEAMSMCW RW ON MID BEAMS, RWE ON END BEAMSR21-9U8BHWT-30 XRB FOR (X-CABLED BEAMS ONLY)MAKE CONNECTIONS IN NU